Deux automotrices ferroviaires lourds de levage de la grue à flèche de la section panneau voie redondante lors d'un programme de remplacement des voies.
4064 x 2704 px | 34,4 x 22,9 cm | 13,5 x 9 inches | 300dpi
Date de la prise de vue:
23 août 2003
Lieu:
Buckinghamshire, UK.
Informations supplémentaires:
Cette image peut avoir des imperfections car il s’agit d’une image historique ou de reportage.
The safest way for rail contractors' work teams to carry out repairs or maintenance on railways is (as pictured here) to separate workers from trains by arranging for all the lines to be blocked and the power to be switched off. An efficient and integrated transportation system is essential for any developed or developing country. Transport drives productivity, improves the quality of life and, carefully planned, is good for the environment. An affordable, sustainable passenger and freight railway service is a vital component of a nation’s economic success. Railways are the safest form of mass transportation. Each day, the UK rail network carries around 22, 000 trains, many are full to capacity and the demand is predicted to grow by 30% in the next decade. It is essential to get more passengers onto an already crowded railway. The system receives a daily pounding from an ever-increasing number of faster and heavier trains and it's no surprise that a huge amount of the rail system needs to be upgraded or replaced to ensure a reliable, efficient and safe system. Unfortunately, for reasons of safety, major works must take place during prolonged 'possessions' or ‘blockades’ when the trains are stopped and the contractors can carry out their essential replacement programmes unimpeded. Skilled rail contractors using sophisticated machinery are utilised to speed the upgrade programme as much as possible.